Fabrication and erection of steel structures at Tata Gopalpur Ferochrome Project.
Approximate Tonnage - 5600 MT during 2015.
 |
 |
 |
Fixing of Cooling Jacket Specification
Fixing of cooling jacket throught the furnace in cylinderical shape Shape of furnace -12 Meter Dis X 7 Meter Cooling Jacket fabricated by ISMC 100 of 1.5 KM running length Purpose – This is purpose of circulation of cooling water for cooling the wall of furnace Vessel bottom level – 2.5 Meter
|
Erection of Overhead EOT Crane Specification
Weight of Crane – 37 meter Erection of Height -17.65 meter Span of crane -18.2 Meter Overhead volume – 7.6 Meter X 19 meter Erection through 70 Meter Crawer crane in Furnace tapping end Purpose – To handle the laddles for furnace No. of cranes – Two numbers Capacity – 32 Meter/10 Meter (Double Hook)
|
Erection of 18MVA Transformer in Furnace Building Specification
Weight of Transformer – 50 MT Erection in height at 11 Meter through 250 MT telescopic crane Oil type transformerbasically used for Arc Furnace
|
 |
 |
Chimney Erection Specification
Weight of Chinmey in 3 part -25 MT Erection from 0 Meter to 40 Meter Erection by 250 MT Telescopic Crane Purpose – Fumes from Furnace to be purify in Gas Cleaning Plant and exhausted by Chimney
|
Copper Bus Tubes Specification
Copperbus tubes are erected over smoke hood of furnace at 13 meter level. Approximate length of copper bus tubes is about 2.2 Kilometer and these are jointed through copper welding under the scheme of U,V and W phase of 18 MVA Transformer. All copper bus tubes are supported by suspension hangers which grips by insulations. This is for transmission of current from 18 MVA transformer to furnace with internal cooling system by water to avoid overheating. These copper bus tubes are mesh around the 3 nos of electrode and 8 nos of charging chutes.
|
 |
 |
Heat Exchanger Duct Specification
These ducts are connected from Furnace Building 33 Meter level to GCP heat exchanger 11 Meter level. Ducts erected by 250 MT tyre mounted telescopic crane Fumes carries heat which generated from furnace is transmitted through these ducts to heat exchanger of GCP for absorbing its heat and exhausted through GCP chimney by help of ID fans. Length of duct – 35 Meter Dia of Duct – 550 mm
|
Gas Cleaning Plant Specification
Total tonnage of GCP- 680 MT GCP consisting of Chimney , ID fans Misc Structures, Bag House, Hopper, Heat Exchanger, Ducts, Silo, Ash Conditioner and etc. All misc are erected by 40 MT crawler crane, 70 MT crawler Crane and 250 MT Tyre mounted telescopic crane for height erection. Purpose- Fumes which carries heat and dust are treated in these Plant. Max Height- 18 mtr
|
 |
 |
 |
Erection of Duct for Furnace Specification
Weight - 2MT Length of duct – 16 Meter Dia of Duct – 550 mm Height of erection - 28 Meter to 11 Meter Purpose–Fume Duct pipe fro furnace to Gas Cleaning Plant heat exchanger
|
Furnace Accessories Specification
These are consists of Smoke Hood, Charging Chutes, Protection Shield, Contact Clamps, Pressure Ring and Electrode Chasing. Erection through Chain Blocks Erection at 7 Meter to 11 Meter Height
|
Water Manifold Specification
Elevation – 11 Meter Main Suction Line -200 NB from Furnace Pump house Delivery line -40 NB to Copper bus tube through Flexible tubes. These are combination of Medium and High pressure water lines
|
 |
 |
 |
Assembly of gallery
|
Erection of Bunker
|
Erection of Bunker
|
 |
 |
 |
Erection of Gallery
BC 5, Trestle TR -1-1.486MT, Gallery GR-1-19.568 MT,Trestle TR -2-3.49 MT, Gallery GR-3-13.69MT, Gallery GR-4-14.02MT
|
Erection of Saf building
Maximum height 40 mtrs
|
Erection of Trestile Tower
Height-17MT, Weight-12MT
|
 |
 |
Fabrication of Hopper
Weight -3.218 MT
|
Briquetting Plant
consisting of 5 buildings as -Drier building(124 MT), Briquetting Building(205 MT)
Fine Bin Building (110 MT) , Transfer House (28 MT) and BBC-6 Conveyor (40 MT)
|